The NESCAFÉ DOLCE GUSTO plant of the Nestlé conglomerate is located in Schwerin in the west of Mecklenburg-Vorpommern. Alpha IC von Henn Architekten was commissioned to provide green building and energy design & simulation services for the company's plant, which was built in 2013 and opened in 2014. In addition to carrying out a pre-assessment with the development of a gold and platinum strategy for building certification, Alpha IC was responsible for simulating the annual energy requirements and providing support in determining the energy requirements from renewable energies. The focus was also on the use of rainwater for toilets and urinals.
Performances |
Green Building |
Energy Design & Simulation |
|
Client |
Henn Architekten |
Building Owner |
Nestlé Deutschland AG |
Use |
Office & Administration |
Industry& Production |
|
GFA |
49.830 m² |
Period of Performance |
2012 - 2014 |
Performances |
Green Building |
Energy Design & Simulation |
Client |
Henn Architekten |
Building Owner |
Nestlé Deutschland AG |
Use |
Office & Administration |
Industry& Production |
GFA |
49.830 m² |
Period of Performance |
2012 - 2014 |

We aim to deliver the best possible impact in our projects.
That is why we use the Alpha IC ESG Radar to visualize the ESG areas of action that our consulting services influence in each project.